Flue gas pipeline for municipal waste incineration plant in Brno
The contract included the manufacture of 13 tonnes of flue pipe, which were subsequently delivered from Paskov to the site of the municipal waste incinerator in Brno. Here, our fitters first dismantled the existing piping, including insulation, which was already in an unsatisfactory condition. Subsequently, the manufactured piping parts were installed from the absorber to the fabric filter of line 3 and the piping was insulated.
Implementation date: 2023